SAP projects industry and trade

The following project experiences refer to

  • SAP implementations and
  • international roll-out-activities

in logistics.  The main focus was on

  • project management and – co-ordination
  • business blueprints und fit/gap-analysis
  • customizing-settings SD
  • data migration
  • trainings
  • testing
  • support activities 

SAP ECC6 – SAP Template Build – Europa

09/2015 – today Scope: SAP Template Build for European countries and Rollout in Norway / UK – Industry: Pharmaceutical Trade – Location: Stuttgart, Germany – Language: English– Position:  O2C Streamlead (freelancer)

Responsibilities

SD-Activities:

  • Planning Detailed Design Phase
  • Managing O2C Onsite Team
  • Delegate / Monitor activities (Design/Development/Config) to O2C Offshore-Team
  • Coordination O2C Sub areas
  • Identify and Progress open Topics / crossfunctional topics
  • Planning / Execution Workshops
  • Planning Build Phase
  • Monitor Creation Design Specification documents

SAP ECC6 – SAP Template Business Blueprint – Europe

07/2014 – 08/2015 Scope: SAP Template Business Blueprint for European countries and Rollout in Norway – Industry: Pharmaceutical Trade – Location: Frankfurt, Germany – Language: English – Position:  SD Wholesale Lead Consultant (freelancer)

Responsibilities

SD-Activities

  • Planning of Workshops
  • Identify/Review Scope and content of workshops
  • Prepare Workshops
  • Run through Workshops
  • Gathering requirements
  • Evaluate Best Practice Solution
  • Support Creation of URS/FS/Design Docs
  • Create Business Blueprint documents
  • Support Creation of Change Requests

SAP SD Rollout and Support / Change Management activities for European Countries

07/2013 – 06/2014: Scope: SD Rollout and Support activities Industry: Cement/RMC/Aggregrates Location: Heidelberg, Germany – Opole, Poland Language: English Position: Consultant @ internal SAP Competence Center (Freelancer)

Responsibilities

SD-Activities:

  • Technical Implementation (Customizing; Input for Development)
  • Preparation and Support of User Acceptance Tests
  • Cutover und Go-Live Activities
  • Analysis and Realization of system requirements/-changes
  • Technical Specifications
  • Functional Tests
  • Troubleshooting
  • Ticket Processing/Follow-up activities

Management/Optimization Global SAP-Support-Process in Germany

04/2012 – 05/2013: Scope: Management, Coordination und Optimization Support-Process for SAP SD/SCM Industry: Agro-chemical Industry Location: Maintal, Germany Language: English Position: Business Process Analyst  (Freelancer)

Responsibilities

SD-Activities:

  • Developing and Delivery of Optimization acitivies: EDI Monitoring + Key User Concept
  • Analyze Processes/Improvements and provide solutions for ongoing  project topics (e.g. Rebates/Output determination/Interfaces)
  • Follow-up and support of Business related topics (Integrate new Functions/Config Change)
  • Incident logging / Incident Follow-ups
  • Management Offshore-Support Partner
  • Key-User Support+Coaching
  • Management Change Requests
  • IDOC Transmissions M2M + Troubleshooting

SAP Implementation ECC 6.0 – China

07/2011 – 12/2011  Scope: Roll-out China Industry: Electronics- Sensors Location: Suzhou, China / Werne, Germany Language: EnglishPosition: Consultant (Freelancer)

Responsibilities

All SD activities:

  • SAP SD Business Blueprint design (to-be-analysis/Fit-Gap-Analysis)
  • Prototyping
  • SD Configuration
  • Tests (UATs+Regression Tests)
  • Trainings

SAP Implementation – USA, Japan + Mexico

10/2010 – 07/2011  Scope: SAP Template build-up; Roll-out USA , Japan and Mexiko Industry: Electronics – Components Location: Carrollton, TX – USA Language: EnglishPosition: Consultant (Freelancer)

Responsibilities

All SD activities:

  • SAP SD Business Blueprint design (to-be-analysis/Fit-Gap-Analysis)
  • Prototyping
  • SD Configuration
  • Input Master Data Migration/Mapping
  • Go-live
  • Post Go-live support
  • Fine Tuning
  • Management Change Requests

SAP SD: Process, Data- and System Harmonization – Roll-out USA

12/2009 – 04/2010  Scope: Preparation and Management sub project SD, Roll-out UGT Miamisburg/Frederiksburg, USA  Industry: Mechanical Engineering  Location: Hedelfingen, Germany / Miamisbrg, USA  Language: English  Position: Management of sub-project

Responsibilities

All SD activities needed for Roll-Out UGT:

  • Country and customer specific customizing (e.g. sales, print tool,texts, foreign trade)
  • Project planning/cost estimation
  • Rparation/wrap-up; Management and Processing Pick-out-Analysis
  • Clarifying open issues
  • Creation/Monitoring work packages
  • Preparation and Processing Basic Trainings via WebEx
  • Coordination and rules Master Data Migration

SAP SD: Process, Data- and System Harmonization – Preparation Phase

10/2009 – 03/2010  Scope: Preparation Phase SD-Preparation and Management of upcoming Roll-outs  Client: Körber-Schleifring Gruppe, Hedelfingen  Industry: Mechanical Engineering  Location: Hedelfingen, Germany  Language: English  Position: Management of sub-project

Responsibilities

Preparation SD activities needed for international Roll-Outs:

  • Project planning
  • Creation Training documents / Pick-out-Analyis concept
  • Coordination Translation of training / work documents
  • Know-How Transfer for Chinese colleagues
  • Coordination and Check of Translation of system settings
  • Coordination SD-Team

SAP SD: Process, Data- and System harmonization – Roll-out CH

07/2009 – 09/2009  Scope: Preparation and Management sub project SD, Roll-out Switzerland  Industry: Mechanical Engineering  Location: Fehraltorf, Switzerland  Language: German  Position: Management of sub-project  Start of Production:September 01, 2009

Responsibilities

SD activities for Roll-Out:

  • Country and customer specific customizing (e.g. sales, texts, foreign trade)
  • Realization
  • Cut-Over-activities
  • Data Migration Management
  • Meetings/Follow-up Open Issues, Integration Tests
  • Planning Trainings
  • Support-Activities

SAP Implementation of Sales processes ERP 6.0

08/2008 – 05/2009  Scope: Implementation SD – SAP ERP 6.0  Industry: Consumer Goods Industry Beverage  Location: Homburg, Germany  Language: German  Position: Consultant  Start of Production:January 2009

Responsibilities

  • Follow up open issues of conception during workshops and information sessions
  • Customizing of relevant sales and billing processes
  • Message determination
  • Preparation and support in I-Tests
  • Creation of training documents
  • Preparation and accomplishment of trainings
  • Go-live and post go-live support activities
  • Creation of customizing documents
  • Remote Support of open issues and CR

SAP Retail – Detailed conception phase

06/2008 – 07/2008  Scope: Detailed conception – SAP Retail (ECC 6.0 EHP3)  Industry: Retail  Location: Coesfeld, Germany  Language: German  Position: Lead Consultant

Responsibilities

SD processes

  • Follow-up and adjustments of blueprints and open issues
  • Planning implementation
  • Design pricing procedures
  • Process direct sale (internet/delivery to store)
  • Process third customer sales (wholesale/stores)
  • Process internal billing

SAP Retail – Phase Business Blueprints

04/2008 – 05/2008  Scope: Creation of Blueprints – SAP Retail (ECC 6.0 EHP3)  Industry: Retail  Country: Coesfeld, Germany  Language: German  Position: Lead Consultant

Responsibilities

Creation of Business Blueprints for SD processes

  • Process direct sale (internet/delivery to store)
  • Process third customer sales (wholesale/stores)
  • Process internal billing

Implementation SAP AFS (SAP ERP ECC 5.0)

07/2007 – 03/2008  Scope: European Roll-out SAP AFS  Industry: Textile Industry  Location: Oudenaarde, Belgium  Language: English  Position: Consultant  Start of Production:November 2007

Responsibilities

SD AFS Conception

  • Customizing
  • Coordination und tests of developing activities

in the following fields:

  • credit/debit process
  • diverse sales and return flows
  • consignment flows
  • add-on commission package
  • Go-live support and post go-live support
  • Optimization phase: Realization of changes and new requirements

Common Template EP I2P (my SAP ERP ECC)

08/2006 – 05/2007  Scope: Common Template – EP I2P (Information Integration Program) Harmonization across and within different BUs  Industry: Aluminium Industry  Location: Zürich, Switzerland / Decin, Czech Republic  Language: English  Position: Coordinator/Integrator SD Teams and Consultant  Start of Production:April 2007

Responsibilities

SAP SD:

  • Coordination between project teams I2P and Decin
  • Adjustment Common Template Configuration Design documents with requirements on the part of site Decin (1. Roll-out)
  • Follow-up on open issues
  • Planning of integration-workshops
  • Review of RICEFs-documents
  • Planning and preparation of training contents
  • Creation of exercises and set up data in the system
  • Authorization Checks / Changes
  • Post Production Support for key and end user
  • Processing of tickets

Feasibility Study –  Analysis phase (AC Pilot)

02/2007 – 03/2007  Scope: Analysis phase PEGASUS – Comparison common template (my SAP ERP ECC)- Plan & analyze deliverables of the I2P AC Pilot  Industry: Plastics Production Industry  Location: Sins, Switzerland  Language: English  Position: Lead Consultant

Responsibilities

Accomplishment of working parties:

  • Actual quantity taken of processes
  • Adjustment of Common Template EP I2P
  • List / review of gaps
  • Agreement of responsibilities
  • Identification of integration topics
  • Final review of analysis results

SAP R/3 MM Coaching

07/2005 – 08/2005  Scope: Optimization of Core Business Processes  Industry: Chemical Industry  Location: Leverkusen, Germany  Language: English  Position: Consultant

Responsibilities

  • Revision / adjustments of Business Blueprints
  • Presentation of optimization-based functions in purchasing
  • Customizing
  • Support